- per page
Brocade 00700-551 - Right Angle Power Cord, 10A 125V, NEMA 5-15P (plug) to IEC 60320-C13 Connector. . Please note: As these items may have to be ordered direct from manufacturer, there may be a 2/3 week lead time.
Part #: 00700-551
Right Angle Power Cord, 10A 125V, NEMA 5-15P (plug) to IEC 60320-C13 Connector. . Please note: As these items may have to be ordered direct from manufacturer, there may be a 2/3 week lead time.
Brocade 10G-SFPP-AOC-1001 - FRU,10M,SFP+,10G,ACTIVE OPTICAL CBL,1-PK. Please note: As these items may have to be ordered direct from manufacturer, there may be a 2/3 week lead time.
Part #: 10G-SFPP-AOC-1001
FRU,10M,SFP+,10G,ACTIVE OPTICAL CBL,1-PK. Please note: As these items may have to be ordered direct from manufacturer, there may be a 2/3 week lead time.
Brocade 10G-SFPP-AOC-2001 - FRU,20M,SFP+,10G,ACTIVE OPTICAL CBL,1-PK. Please note: As these items may have to be ordered direct from manufacturer, there may be a 2/3 week lead time.
Part #: 10G-SFPP-AOC-2001
FRU,20M,SFP+,10G,ACTIVE OPTICAL CBL,1-PK. Please note: As these items may have to be ordered direct from manufacturer, there may be a 2/3 week lead time.
Brocade 10G-SFPP-LR - 10GBASE-LR, SFP+ optic (LC), for up to 10km over SMF . Please note: As these items may have to be ordered direct from manufacturer, there may be a 2/3 week lead time.
Part #: 10G-SFPP-LR
10GBASE-LR, SFP+ optic (LC), for up to 10km over SMF . Please note: As these items may have to be ordered direct from manufacturer, there may be a 2/3 week lead time.
Brocade 10G-SFPP-LR-8 - 10GBASE-LR,SFPP SMF LC CONNECTOR 8-PACK. Please note: As these items may have to be ordered direct from manufacturer, there may be a 2/3 week lead time.
Part #: 10G-SFPP-LR-8
10GBASE-LR,SFPP SMF LC CONNECTOR 8-PACK. Please note: As these items may have to be ordered direct from manufacturer, there may be a 2/3 week lead time.
Brocade 10G-SFPP-LRM - 10GBASE-LRM, 1310NM SFP+ OPTIC (LC), TAR. Please note: As these items may have to be ordered direct from manufacturer, there may be a 2/3 week lead time.
Part #: 10G-SFPP-LRM
10GBASE-LRM, 1310NM SFP+ OPTIC (LC), TAR. Please note: As these items may have to be ordered direct from manufacturer, there may be a 2/3 week lead time.
Brocade 10G-SFPP-SR - 10GBASE-SR, SFP+ optic (LC), target range 300m over MMF . Please note: As these items may have to be ordered direct from manufacturer, there may be a 2/3 week lead time.
Part #: 10G-SFPP-SR
10GBASE-SR, SFP+ optic (LC), target range 300m over MMF . Please note: As these items may have to be ordered direct from manufacturer, there may be a 2/3 week lead time.
Brocade 10G-SFPP-SR-8 - 10GBASE-SR,SFPP MMF LC CONNECTOR 8-PACK. Please note: As these items may have to be ordered direct from manufacturer, there may be a 2/3 week lead time.
Part #: 10G-SFPP-SR-8
10GBASE-SR,SFPP MMF LC CONNECTOR 8-PACK. Please note: As these items may have to be ordered direct from manufacturer, there may be a 2/3 week lead time.
Brocade 10G-SFPP-TWX-0101 - DIRECT ATTACHED SFPP COPPER,1M,1-PACK. Please note: As these items may have to be ordered direct from manufacturer, there may be a 2/3 week lead time.
Part #: 10G-SFPP-TWX-0101
DIRECT ATTACHED SFPP COPPER,1M,1-PACK. Please note: As these items may have to be ordered direct from manufacturer, there may be a 2/3 week lead time.
Brocade 10G-SFPP-TWX-0108 - DIRECT ATTACHED SFPP COPPER,1M,8-PACK. Please note: As these items may have to be ordered direct from manufacturer, there may be a 2/3 week lead time.
Part #: 10G-SFPP-TWX-0108
DIRECT ATTACHED SFPP COPPER,1M,8-PACK. Please note: As these items may have to be ordered direct from manufacturer, there may be a 2/3 week lead time.
- per page



Waste and portable battery regulations